Home » Tag Archives: rehabilitation project

Tag Archives: rehabilitation project

Gracie Creek Pond

P6130021

Swung by the Gracie Creek Pond on the north side of Calamus Reservoir recently.  For those of you that might not know, there is a little pond there where highway 96 crosses Gracie Creek.  The water from Gracie Creek is cold enough to support trout, so we frequently stock catchable-size, 10-inch rainbow trout into the pond.  There is easy access there including an accessible fishing dock and it is a popular fishing spot. Unfortunately, cold water is not the only …

Read More »

Gracie Creek Pond temporarily closed to access as work begins on rehabilitation project

NGPC news release logo

The Gracie Creek Pond in Loup County will be closed temporarily to fishing and public access as work on its rehabilitation will begin with equipment mobilization May 23. The project will continue through the summer. Angler access will continue downstream of Nebraska Highway 96 and pond outlets. This popular trout fishing pond, located at the upper end of Calamus Reservoir, was severely degraded with sedimentation during the 2019 spring flooding. During the project, the pond level will be lowered by …

Read More »

A News Item, Gracie Creek Pond

GracieCreekc

Just want to blog about one news item today.  Again, just trying to spread the word.  No, this may not interest everyone, but I know it is a very popular fishing spot.  This news will be of interest to a lot of folks: Gracie Creek Pond rehabilitation project initial phase to begin LINCOLN, Neb. – Anglers will notice construction work at Gracie Creek Pond on the upstream end of Calamus Reservoir in Loup County. The work is the initial phase …

Read More »

Gracie Creek Pond rehabilitation project initial phase to begin

NGPC Latest News logo

LINCOLN, Neb. – Anglers will notice construction work at Gracie Creek Pond on the upstream end of Calamus Reservoir in Loup County. The work is the initial phase of the pond’s rehabilitation project. Nebraska Department of Transportation crews will remove nearly 20,000 cubic yards of soil from the north and west side of the parking lot. The soil will be removed to make way for sediment to be excavated during the pond’s rehabilitation, which should begin late this summer or …

Read More »